Next Decade, Rio Grande LNG Uprate

From the ProvenHand pipeline wiki

Next Decade, Rio Grande LNG Uprate is a facility project at Rio Grande LNG in Texas, operated by Rio Grande LNG, LLC,Rio Grande LNG Train 4, LLC,Rio Grande LNG Train 5, LLC.

Next Decade, Rio Grande LNG Uprate
Also calledRio Grande LNG Production Increase Project[1]
General information
KindFacility project[1]
StatusProposed[2]
Owner and operator
FacilityRio Grande LNG[2]
StateTexas[2]
FERC docketCP26-31[1]
Technical information
Capacity added0.44 Bcfd (FERC LNG map, Sep 2026)[2]
On ProvenHand
Hands listed0

Next Decade, Rio Grande LNG Uprate is a facility project at Rio Grande LNG in Texas, operated by Rio Grande LNG, LLC,Rio Grande LNG Train 4, LLC,Rio Grande LNG Train 5, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Next Decade, Rio Grande LNG Uprate? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-31”. Federal Energy Regulatory Commission. 21 November 2025. Retrieved 3 October 2026.
  2. “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.