Nine Mile Project
From the ProvenHand pipeline wiki
Nine Mile Project is a natural gas pipeline in Louisiana, operated by Gulf South Pipeline Company, LLC. It runs 2.1 miles of 30" pipe.
| Nine Mile Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | Under construction[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Louisiana[3] |
| Counties | Assumption[3] |
| FERC docket | CP13-12[4] |
| Technical information | |
| Length | 2.1 mi[5] |
| Pipe size | 30"[5] |
| Cost | $12,400,000[5] |
| On ProvenHand | |
| Hands listed | 0 |
Nine Mile Project is a natural gas pipeline in Louisiana, operated by Gulf South Pipeline Company, LLC. It runs 2.1 miles of 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Nine Mile Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “The Nine Mile Project Weekly Construction Progress Report (March 4 through March 18, 2013), Gulf South Pipeline Company, LP (CP13-12)”. Gulf South Pipeline Company, LP (filed with FERC). 19 March 2013. Retrieved 4 October 2026.
- “The Nine Mile Project Weekly Construction Progress Report (June 12 through June 20, 2013), Gulf South Pipeline Company, LP (CP13-12)”. Gulf South Pipeline Company, LP (filed with FERC). 21 June 2013. Retrieved 4 October 2026.
- “Notice of Gulf South Pipeline Company, LP's 11/1/12 filing under blanket authorization (CP13-12)”. FERC. 13 November 2012. Retrieved 4 October 2026.
- “FERC eLibrary docket CP13-12”. Federal Energy Regulatory Commission. 1 November 2012. Retrieved 3 October 2026.
- “Environmental Assessment Report, Gulf South Pipeline Company, LP, Rodrigue and Napoleonville Compressor Stations (CP13-12)”. FERC. 27 December 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.