NKY Gate Enhancement Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
NKY Gate Enhancement Project is a natural gas pipeline in Kentucky and Ohio, operated by Columbia Gas Transmission, LLC. It runs 31 miles.
| NKY Gate Enhancement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] or Replacement[3][sources disagree] |
| Status | Proposed[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Operator | |
| States | Kentucky, Ohio[2][3] |
| FERC docket | CP26-19[1] |
| Technical information | |
| Length | 31 mi[2][3] |
| Cost | $429 million (Columbia estimate, 2025 application)[3] |
| On ProvenHand | |
| Hands listed | 0 |
NKY Gate Enhancement Project is a natural gas pipeline in Kentucky and Ohio, operated by Columbia Gas Transmission, LLC. It runs 31 miles.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on NKY Gate Enhancement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-19”. Federal Energy Regulatory Commission. 10 November 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Application and Establishing Intervention Deadline, Columbia Gas Transmission, LLC, NKY Gate Enhancement Project (CP26-19)”. FERC (public notice, eLibrary). 24 November 2025. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.