North Baja Pipeline LNG Expansion Project (Phase I is a natural gas pipeline expansion in Arizona and California, operated by North Baja Pipeline, LLC. It entered service in 2008.

North Baja Pipeline LNG Expansion Project (Phase I
Also calledNorth Baja Pipeline Expansion Phase I[1], LNG Expansion Project (Phase I[2], North Baja Pipeline Expansion Project[3]
General information
KindPipeline project[2]
Project typeExpansion[1][3]
StatusIn service[1]
CommodityNatural gas[1]
Owner and operator
StatesArizona, California[1][2]
Approved2 October 2007[2][4]
In service15 March 2008[1]
FERC docketCP06-61[2]
FERC pre-filing docketPF05-14[2]
Technical information
Length125.6 mi[2] or 2 mi[1][sources disagree]
Pipe size42", 48"[1]
Capacity2700 MMcf/d (FERC project list)[2] or 614 MMcf/d additional capacity (EIA)[1][sources disagree]
Cost$4 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

North Baja Pipeline LNG Expansion Project (Phase I is a natural gas pipeline expansion in Arizona and California, operated by North Baja Pipeline, LLC. It entered service in 2008.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 2700 MMcf/d (FERC project list)[2]
  • 614 MMcf/d additional capacity (EIA)[1]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on North Baja Pipeline LNG Expansion Project (Phase I? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP06-61”. Federal Energy Regulatory Commission. 7 February 2006. Retrieved 3 October 2026.
  4. “Order Issuing Certificate and Amending Presidential Permit, North Baja Pipeline, LLC (CP06-61 et al.)”. FERC (order). 2 October 2007. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.