North Seattle Delivery Lateral Expansion
From the ProvenHand pipeline wiki
North Seattle Delivery Lateral Expansion is a natural gas pipeline in Washington, operated by Puget Sound Energy. It was built and entered service in 2012. It runs 2.2 miles of 20" pipe.
| North Seattle Delivery Lateral Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] or Replacement[2][sources disagree] |
| Status | In service[1][3] |
| Commodity | Natural gas[1][2] |
| Operator | |
| Owner and operator | |
| State | Washington[1][2] |
| Counties | Snohomish[2] |
| Approved | 4 October 2011[5] |
| Construction started | 9 July 2012[6] |
| In service | November 2012[1] |
| FERC docket | CP11-520[1] |
| Technical information | |
| Length | 2.2 mi[1][2] |
| Pipe size | 20"[1][2] |
| Capacity | 84.2 MMcf/d additional capacity (EIA)[1] |
| Capacity added | 84,200 dekatherms per day[2] |
| Cost | approximately $12.8 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
North Seattle Delivery Lateral Expansion is a natural gas pipeline in Washington, operated by Puget Sound Energy. It was built and entered service in 2012. It runs 2.2 miles of 20" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on North Seattle Delivery Lateral Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Request under Blanket Authorization, North Seattle Delivery Lateral Expansion Project, Northwest Pipeline GP (CP11-520)”. FERC. 5 August 2011. Retrieved 4 October 2026.
- “Weekly Status Report No. 21, North Seattle Delivery Lateral Expansion Project, Northwest Pipeline GP (CP11-520)”. Northwest Pipeline GP (filed with FERC). 18 December 2012. Retrieved 4 October 2026.
- “FERC eLibrary docket CP11-520”. Federal Energy Regulatory Commission. 26 July 2011. Retrieved 3 October 2026.
- “Letter order granting extension of time to 11/1/12, North Seattle Delivery Lateral Expansion Project, Northwest Pipeline GP (CP11-520)”. FERC. 26 September 2012. Retrieved 4 October 2026.
- “Weekly Status Report No. 1 (July 9 through July 15, 2012), North Seattle Delivery Lateral Expansion Project, Northwest Pipeline GP (CP11-520)”. Northwest Pipeline GP (filed with FERC). 18 July 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.