North Seattle Delivery Lateral Expansion

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

North Seattle Delivery Lateral Expansion is a natural gas pipeline in Washington, operated by Puget Sound Energy. It was built and entered service in 2012. It runs 2.2 miles of 20" pipe.

North Seattle Delivery Lateral Expansion
General information
KindPipeline project[1]
Project typeLateral[1] or Replacement[2][sources disagree]
StatusIn service[1][3]
CommodityNatural gas[1][2]
Operator
Owner and operator
StateWashington[1][2]
CountiesSnohomish[2]
Approved4 October 2011[5]
Construction started9 July 2012[6]
In serviceNovember 2012[1]
FERC docketCP11-520[1]
Technical information
Length2.2 mi[1][2]
Pipe size20"[1][2]
Capacity84.2 MMcf/d additional capacity (EIA)[1]
Capacity added84,200 dekatherms per day[2]
Costapproximately $12.8 million[2]
On ProvenHand
Hands listed0

North Seattle Delivery Lateral Expansion is a natural gas pipeline in Washington, operated by Puget Sound Energy. It was built and entered service in 2012. It runs 2.2 miles of 20" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on North Seattle Delivery Lateral Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Notice of Request under Blanket Authorization, North Seattle Delivery Lateral Expansion Project, Northwest Pipeline GP (CP11-520)”. FERC. 5 August 2011. Retrieved 4 October 2026.
  3. “Weekly Status Report No. 21, North Seattle Delivery Lateral Expansion Project, Northwest Pipeline GP (CP11-520)”. Northwest Pipeline GP (filed with FERC). 18 December 2012. Retrieved 4 October 2026.
  4. “FERC eLibrary docket CP11-520”. Federal Energy Regulatory Commission. 26 July 2011. Retrieved 3 October 2026.
  5. “Letter order granting extension of time to 11/1/12, North Seattle Delivery Lateral Expansion Project, Northwest Pipeline GP (CP11-520)”. FERC. 26 September 2012. Retrieved 4 October 2026.
  6. “Weekly Status Report No. 1 (July 9 through July 15, 2012), North Seattle Delivery Lateral Expansion Project, Northwest Pipeline GP (CP11-520)”. Northwest Pipeline GP (filed with FERC). 18 July 2012. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.