North Summit Well Installation Project
From the ProvenHand pipeline wiki
North Summit Well Installation Project is a facility project, operated by Eastern Gas Transmission and Storage, Inc..
| North Summit Well Installation Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Status | Under construction[2] |
| Owner and operator | |
| Counties | Fayette[3] |
| FERC docket | CP26-37[1] |
| Technical information | |
| Pipe size | 8"[3] |
| Cost | $10,615,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
North Summit Well Installation Project is a facility project, operated by Eastern Gas Transmission and Storage, Inc..
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on North Summit Well Installation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-37”. Federal Energy Regulatory Commission. 10 December 2025. Retrieved 3 October 2026.
- “Eastern Gas Transmission and Storage, Inc. submits Weekly Construction Status Report No. 32 for the period of 09/19/2026 to 09/25/2026 re the North Summit Well Installation Project under CP26-37.”. Eastern Gas Transmission and Storage, Inc. (filed with FERC). 2 October 2026. Retrieved 3 October 2026.
- “Environmental Assessment Report for Eastern Gas Transmission and Storage, Inc.'s 157.205(b), 157.208(b), and 157.213(b) – Prior Notice Filing – Storage Facilities under CP26-37.”. Federal Energy Regulatory Commission (staff document). 17 February 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.