Northern Columbus Loop - Phase VII
From the ProvenHand pipeline wiki
Northern Columbus Loop - Phase VII is a pipeline project in Ohio, operated by Columbia Gas of Ohio. It runs 16 miles of 16", 24" pipe.
| Northern Columbus Loop - Phase VII | |
|---|---|
| Also called | Northern Columbus Loop - Phase 7 Pipeline Project[1], Northern Loop Pipeline Project[2] |
| General information | |
| Kind | Pipeline project[3] |
| Status | Approved[3] |
| Owner and operator | |
| State | Ohio[4] |
| Counties | Delaware, Union[2] |
| Approved | 16 September 2021[3] |
| Ohio Power Siting Board case | 20-1236-GA-BTX[4] |
| Technical information | |
| Length | 16 mi[1] |
| Pipe size | 16", 24"[1] |
| On ProvenHand | |
| Hands listed | 0 |
Northern Columbus Loop - Phase VII is a pipeline project in Ohio, operated by Columbia Gas of Ohio. It runs 16 miles of 16", 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Northern Columbus Loop - Phase VII? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Northern Loop Update and Initial Written Notice, Northern Columbus Loop - Phase 7 Pipeline Project (Columbia Gas of Ohio, Wayback capture of 2023-05-24)”. Columbia Gas of Ohio, Inc. Archived from the original on 24 May 2023. Retrieved 3 October 2026.
- “Northern Loop Pipeline Project (Columbia Gas of Ohio project page)”. Columbia Gas of Ohio, Inc. Retrieved 3 October 2026.
- “PUCO Docketing Information System, case record and docket list for OPSB case 20-1236”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
- “PUCO Docketing Information System: gas cases, purpose BTX”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.