Northern Lights 2025 Expansion is a natural gas pipeline expansion in Minnesota and Wisconsin, operated by Northern Natural Gas Company. Construction began in 2025 and the line entered service in 2026. It runs 8.6 miles of 8", 30", 36" pipe.

Northern Lights 2025 Expansion
Also calledNorthern Natural Gas Company's Northern Lights 2025 Expansion Project[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StatesMinnesota, Wisconsin[2][3]
CountiesMinnesota: Freeborn, Houston, Washington
Wisconsin: Monroe
[4]
Approved19 February 2025[3]
Construction started21 April 2025[5]
In service28 January 2026[2]
FERC docketCP24-60[1]
Contractors
Technical information
Length8.6 mi[2][3]
Pipe size8", 30", 36"[2]
Capacity46.06 MMcf/d (FERC project list)[3] or 46 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$60.7 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Northern Lights 2025 Expansion is a natural gas pipeline expansion in Minnesota and Wisconsin, operated by Northern Natural Gas Company. Construction began in 2025 and the line entered service in 2026. It runs 8.6 miles of 8", 30", 36" pipe.

Contractorsedit

ContractorWorkScopeYears
Otis Minnesota Services[5]Primeon-site construction contractor (as Otis Minnesota Services, LLC) for the Elk River 3rd branch line extension and the Farmington to Hugo C-line extension (Washington Co MN)from 1 April 2025
K & K, Inc.[5]Primeon-site construction contractor for the Lake Mills to Albert Lea E-line extension (Freeborn Co MN) and the Tomah branch line loop (Monroe Co WI)from 1 April 2025

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 46.06 MMcf/d (FERC project list)[3]
  • 46 MMcf/d additional capacity (EIA)[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Northern Lights 2025 Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP24-60”. Federal Energy Regulatory Commission. 16 February 2024. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Environmental Assessment, Northern Lights 2025 Expansion Project (CP24-60)”. FERC staff. 13 September 2024. Retrieved 4 October 2026.
  5. “Biweekly Environmental Inspector Report No. 8 (period ending 2025-06-08), Northern Lights 2025 Expansion Project”. Northern Natural Gas Company (filed with FERC). 12 June 2025. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.