Northern Natural Gas South Sioux City to Sioux Falls A-line Replacement Project is a natural gas pipeline replacement in Nebraska and South Dakota, operated by Northern Natural Gas Company. Construction began in 2021.

Northern Natural Gas South Sioux City to Sioux Falls A-line Replacement Project
Also calledSouth Sioux City to Sioux Falls A-line Replacement Project[1]
General information
KindPipeline project[1]
Project typeReplacement[1][2]
StatusIn service[1][3]
CommodityNatural gas[1][4]
Operator
Owner and operator
StatesNebraska, South Dakota[1][4]
CountiesNebraska: Dakota, Dixon
South Dakota: Lincoln, Union
[4]
Approved22 March 2021[4]
Construction started8 July 2021[5]
In serviceJune 2023[1] or 13 September 2022[3][sources disagree]
FERC docketCP20-487[2]
FERC pre-filing docketPF19-8[2]
Contractors
Technical information
Length84 mi[1] or 87.3 mi[4][sources disagree]
Pipe size12 in[1] or 3 in, 12 in[4][sources disagree]
Cost$173,837,303[4]
On ProvenHand
Hands listed0

Northern Natural Gas South Sioux City to Sioux Falls A-line Replacement Project is a natural gas pipeline replacement in Nebraska and South Dakota, operated by Northern Natural Gas Company. Construction began in 2021.

Contractorsedit

ContractorWorkYears
K & K, Inc.[5]Primefrom 8 July 2021

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Diameters
In service
  • June 2023[1]
  • 13 September 2022[3]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Northern Natural Gas South Sioux City to Sioux Falls A-line Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP20-487”. Federal Energy Regulatory Commission. 29 June 2020. Retrieved 3 October 2026.
  3. “Notice of In-service and Notice of Abandonment, South Sioux City to Sioux Falls A-line Replacement (CP20-487)”. Northern Natural Gas Company (filed with FERC). 15 September 2022. Retrieved 3 October 2026.
  4. “Order Issuing Certificate and Approving Abandonment, Northern Natural Gas Company, South Sioux City to Sioux Falls A-line Replacement Project (CP20-487)”. FERC. 22 March 2021. Retrieved 3 October 2026.
  5. “Weekly Environmental Inspector Report No. 18 (to Sept 5, 2021), South Sioux City to Sioux Falls A-line Replacement Project (CP20-487)”. Northern Natural Gas Company (filed with FERC). 13 September 2021. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.