Northwest Pipeline Acquisition and Reliability Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Northwest Pipeline Acquisition and Reliability Project is a natural gas pipeline expansion in Oregon and Washington, operated by Northwest Pipeline LLC. It runs 18 miles of 20" pipe.

Northwest Pipeline Acquisition and Reliability Project
Also calledKelso-Beaver Reliability Project[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusApproved[2] or Under construction[3][sources disagree]
CommodityNatural gas[2]
Owner and operator
StatesOregon, Washington[2][4][5]
CountiesCowlitz[6]
Approved20 November 2025[4]
FERC docketCP25-89[1]
Technical information
Length18 mi[2][4][5]
Pipe size20"[6]
Capacity253.4 MMcf/d (FERC project list)[4][5] or 183 MMcf/d additional capacity (EIA)[2][sources disagree]
Horsepower added5,500 hp[6]
Cost$60,800,979 (Northwest estimate, 2025 application)[6]
On ProvenHand
Hands listed0

Northwest Pipeline Acquisition and Reliability Project is a natural gas pipeline expansion in Oregon and Washington, operated by Northwest Pipeline LLC. It runs 18 miles of 20" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 253.4 MMcf/d (FERC project list)[4][5]
  • 183 MMcf/d additional capacity (EIA)[2]
Status
  • Approved[2]
  • Under construction[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Northwest Pipeline Acquisition and Reliability Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-89”. Federal Energy Regulatory Commission. 27 February 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Monthly Construction Status Report for 08/01/2026 to 08/31/2026, Kelso-Beaver Reliability Project, Northwest Pipeline LLC (CP25-89)”. Northwest Pipeline LLC (filed with FERC; eLibrary filing description). 8 September 2026. Retrieved 4 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
  6. “Notice of Applications and Establishing Intervention Deadline, Northwest Pipeline LLC, Kelso-Beaver Reliability Project (CP25-89 et al.)”. FERC (public notice, eLibrary). 13 March 2025. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.