Northwoods Project
From the ProvenHand pipeline wiki
Northwoods Project is a natural gas pipeline expansion in Michigan and Wisconsin, operated by ANR Pipeline Company. It runs 92 miles of 36" pipe.
| Northwoods Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | Pre-filing[1][2][3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Michigan, Wisconsin[2][4] |
| Counties | Michigan: Iron Wisconsin: Brown, Calumet, Florence, Fond du Lac, Forest, Marinette, Oconto, Outagamie, Portage, Shawano, Waupaca, Winnebago[4] |
| FERC pre-filing docket | PF26-6[1] |
| Technical information | |
| Length | 92 mi[2] |
| Pipe size | 36"[2] |
| Capacity | 390 MMcf/d additional capacity (EIA)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Northwoods Project is a natural gas pipeline expansion in Michigan and Wisconsin, operated by ANR Pipeline Company. It runs 92 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Northwoods Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket PF26-6”. Federal Energy Regulatory Commission. 20 February 2026. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Monthly Pre-filing Progress Report No. 6 for 08/01/2026 to 08/31/2026, ANR Northwoods Project (PF26-6)”. ANR Pipeline Company (filed with FERC; eLibrary filing description). 24 September 2026. Retrieved 4 October 2026.
- “Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned Northwoods Project, ANR Pipeline Company (PF26-6)”. FERC (public notice, eLibrary). 29 June 2026. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.