Nueva Era Dos Border Crossing
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Nueva Era Dos Border Crossing is a natural gas pipeline in Texas, operated by Nueva Era Dos, LLC. It runs 0.7 miles of 36" pipe.
| Nueva Era Dos Border Crossing | |
|---|---|
| Also called | Nueva Era Dos Pipeline Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | New build[1] |
| Status | Proposed[1] or Approved[3][sources disagree] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| Operator | |
| State | Texas[1][4] |
| Counties | Maverick[3] |
| Approved | 29 May 2026[3][4] |
| FERC docket | CP25-527[2] |
| Technical information | |
| Length | 0.7 mi[1][4] |
| Pipe size | 36"[1][3] |
| Capacity | 1000 MMcf/d additional capacity (EIA)[1] or design capacity of one billion standard cubic feet per day[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Nueva Era Dos Border Crossing is a natural gas pipeline in Texas, operated by Nueva Era Dos, LLC. It runs 0.7 miles of 36" pipe.
Crossings
| Feature | Method |
|---|---|
| Rio Grande[5] | HDD |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Status |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Nueva Era Dos Border Crossing? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP25-527”. Federal Energy Regulatory Commission. 24 July 2025. Retrieved 3 October 2026.
- “Order Issuing Presidential Permit and Granting Authorization Under Section 3, Nueva Era Dos, LLC (CP25-527)”. Federal Energy Regulatory Commission. 29 May 2026. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Environmental Assessment, Nueva Era Dos Pipeline Project (CP25-527)”. Federal Energy Regulatory Commission. 30 January 2026. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.