Oak Grove Enhancement Project
From the ProvenHand pipeline wiki
Oak Grove Enhancement Project is a natural gas pipeline replacement in Louisiana, operated by ANR Pipeline Company. Construction began in 2024 and the line entered service in 2025.
| Oak Grove Enhancement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[2][3] |
| Status | In service[4] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Louisiana[5] |
| Counties | Richland, West Carroll[6] |
| Approved | 25 July 2024[2][5] |
| Construction started | 20 November 2024[7] |
| In service | 29 September 2025[4] |
| FERC docket | CP23-523[1] |
| Technical information | |
| Length | 33 mi[5] or 34.1 mi[7][sources disagree] |
| Pipe size | 30"[2] |
| Cost | $116,344,624 post-construction total (final cost report)[8] |
| On ProvenHand | |
| Hands listed | 0 |
Oak Grove Enhancement Project is a natural gas pipeline replacement in Louisiana, operated by ANR Pipeline Company. Construction began in 2024 and the line entered service in 2025.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Oak Grove Enhancement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-523”. Federal Energy Regulatory Commission. 1 August 2023. Retrieved 3 October 2026.
- “Order Issuing Certificate and Approving Abandonment, ANR Pipeline Company (188 FERC 61,063)”. FERC. 25 July 2024. Retrieved 3 October 2026.
- “Oak Grove Enhancement Project Fact Sheet”. TC Energy. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Oak Grove Enhancement Project (CP23-523)”. ANR Pipeline Company (filed with FERC). 30 September 2025. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Environmental Assessment, Oak Grove Enhancement Project (CP23-523)”. FERC Office of Energy Projects. 1 March 2024. Retrieved 3 October 2026.
- “Request to place project facilities into service, Oak Grove Enhancement Project (CP23-523)”. ANR Pipeline Company (filed with FERC). 8 September 2025. Retrieved 3 October 2026.
- “Final Cost Report, Oak Grove Enhancement Project (CP23-523)”. ANR Pipeline Company (filed with FERC). 27 March 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.