Oak Grove Enhancement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Oak Grove Enhancement Project is a natural gas pipeline replacement in Louisiana, operated by ANR Pipeline Company. Construction began in 2024 and the line entered service in 2025.

Oak Grove Enhancement Project
General information
KindPipeline project[1]
Project typeReplacement[2][3]
StatusIn service[4]
CommodityNatural gas[2]
Owner and operator
StateLouisiana[5]
CountiesRichland, West Carroll[6]
Approved25 July 2024[2][5]
Construction started20 November 2024[7]
In service29 September 2025[4]
FERC docketCP23-523[1]
Technical information
Length33 mi[5] or 34.1 mi[7][sources disagree]
Pipe size30"[2]
Cost$116,344,624 post-construction total (final cost report)[8]
On ProvenHand
Hands listed0

Oak Grove Enhancement Project is a natural gas pipeline replacement in Louisiana, operated by ANR Pipeline Company. Construction began in 2024 and the line entered service in 2025.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Oak Grove Enhancement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP23-523”. Federal Energy Regulatory Commission. 1 August 2023. Retrieved 3 October 2026.
  2. “Order Issuing Certificate and Approving Abandonment, ANR Pipeline Company (188 FERC 61,063)”. FERC. 25 July 2024. Retrieved 3 October 2026.
  3. “Oak Grove Enhancement Project Fact Sheet”. TC Energy. Retrieved 3 October 2026.
  4. “Notice of Commencement of Service, Oak Grove Enhancement Project (CP23-523)”. ANR Pipeline Company (filed with FERC). 30 September 2025. Retrieved 3 October 2026.
  5. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  6. “Environmental Assessment, Oak Grove Enhancement Project (CP23-523)”. FERC Office of Energy Projects. 1 March 2024. Retrieved 3 October 2026.
  7. “Request to place project facilities into service, Oak Grove Enhancement Project (CP23-523)”. ANR Pipeline Company (filed with FERC). 8 September 2025. Retrieved 3 October 2026.
  8. “Final Cost Report, Oak Grove Enhancement Project (CP23-523)”. ANR Pipeline Company (filed with FERC). 27 March 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.