Lockridge Extension Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Lockridge Extension Project is a natural gas pipeline expansion in Texas, operated by Natural Gas Pipeline Company of America. It runs 16.8 miles of 30" pipe.

Lockridge Extension Project
Also calledLockridge Extension Pipeline[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2][3]
CommodityNatural gas[2]
Operator
Owner and operator
StateTexas[1][2]
CountiesPecos, Reeves, Ward[4]
Approved17 October 2019[1][4]
In service28 September 2020[2] or 18 September 2020[3][sources disagree]
FERC docketCP19-52[1]
Technical information
Length16.8 mi[1][2][4]
Pipe size30"[2][4]
Capacity500 MMcf/d (FERC project list)[1][2]
Cost$49.1 million (EIA estimate; no dollar year given)[2] or approximately $51.6 million (NGPL's estimate in the order)[4][sources disagree]
On ProvenHand
Hands listed0

Lockridge Extension Project is a natural gas pipeline expansion in Texas, operated by Natural Gas Pipeline Company of America. It runs 16.8 miles of 30" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $49.1 million (EIA estimate; no dollar year given)[2]
  • approximately $51.6 million (NGPL's estimate in the order)[4]
In service
  • 28 September 2020[2]
  • 18 September 2020[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Lockridge Extension Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of in-service date, Lockridge Extension Pipeline Project (CP19-52)”. Natural Gas Pipeline Company of America LLC (filed with FERC). 28 September 2020. Retrieved 4 October 2026.
  4. “Order Issuing Certificate, Natural Gas Pipeline Company of America LLC (CP19-52)”. Federal Energy Regulatory Commission. 17 October 2019. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.