Ohio River Crossing Replacement Project
From the ProvenHand pipeline wiki
Ohio River Crossing Replacement Project is a natural gas pipeline replacement in Ohio, operated by Texas Eastern Transmission, LP. Construction began in 2023.
| Ohio River Crossing Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[2] |
| Status | In service[3] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Ohio[1] |
| Counties | Monroe[1] |
| Construction started | 10 October 2023[4] |
| FERC docket | CP23-520[2] |
| Technical information | |
| Pipe size | 30"[1] |
| Cost | $14,100,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
Ohio River Crossing Replacement Project is a natural gas pipeline replacement in Ohio, operated by Texas Eastern Transmission, LP. Construction began in 2023.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Ohio River Crossing Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Ohio River Crossing Replacement Project (CP23-520)”. FERC. 2 October 2023. Retrieved 4 October 2026.
- “FERC eLibrary docket CP23-520”. Federal Energy Regulatory Commission. 24 July 2023. Retrieved 3 October 2026.
- “Weekly Report #51, final (Sept 24 to Oct 1, 2024), Ohio River Crossing Replacement (CP23-520)”. Texas Eastern Transmission, LP (filed with FERC). 2 October 2024. Retrieved 4 October 2026.
- “Weekly Report No. 1 (Oct 2023), Ohio River Crossing Replacement (CP23-520)”. Texas Eastern Transmission, LP (filed with FERC). 17 October 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.