Ohio Valley Connector Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Ohio Valley Connector Expansion Project is a natural gas pipeline expansion in Ohio, Pennsylvania and West Virginia, operated by Equitrans, L.P.. It runs 5.5 miles of 12", 24" pipe.

Ohio Valley Connector Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusIn service[2][3]
CommodityNatural gas[2][4]
Owner and operator
Operator
Facility projects
StatesOhio, Pennsylvania, West Virginia[2][5]
CountiesOhio: Monroe
Pennsylvania: Greene

West Virginia: Wetzel
[4]
Approved15 June 2023[4][5]
In service2024[2] or 2025[3][sources disagree]
FERC docketCP22-44[1]
Technical information
Length5.5 mi[2][5]
Pipe size12", 24"[2]
Capacity350 MMcf/d (FERC project list)[2][5]
Cost$161 million (EIA estimate; no dollar year given)[2] or approximately $160 million expected total investment[6][sources disagree]
On ProvenHand
Hands listed0

Ohio Valley Connector Expansion Project is a natural gas pipeline expansion in Ohio, Pennsylvania and West Virginia, operated by Equitrans, L.P.. It runs 5.5 miles of 12", 24" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $161 million (EIA estimate; no dollar year given)[2]
  • approximately $160 million expected total investment[6]
In service

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Ohio Valley Connector Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP22-44”. Federal Energy Regulatory Commission. 28 January 2022. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notification of In-Service Date, Ohio Valley Connector Expansion Project (CP22-44)”. Equitrans, L.P. (filed with FERC). 7 April 2025. Retrieved 4 October 2026.
  4. “Order Issuing Certificate, Equitrans, L.P., Ohio Valley Connector Expansion Project (CP22-44)”. Federal Energy Regulatory Commission. 15 June 2023. Retrieved 3 October 2026.
  5. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  6. “Equitrans Midstream Corporation first quarter 2024 earnings release (8-K Exhibit 99.1)”. Equitrans Midstream Corporation (filed with the SEC). 30 April 2024. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.