Okeechobee Expansion Project

From the ProvenHand pipeline wiki

Okeechobee Expansion Project is a pipeline expansion in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2019. It runs 3.4 miles of 36" pipe.

Okeechobee Expansion Project
General information
Project typeExpansion[1]
StatusIn service[2]
Owner and operator
StateFlorida[3]
CountiesHillsborough, Martin, Polk[3]
Construction started5 March 2019[4]
FERC docketCP18-531[1]
Technical information
Length3.4 mi[3]
Pipe size36"[2]
Capacity added12,000 million British thermal units per day (MMBtu/d) of available firm transportation service[3]
Costapproximately $19,500,000[3]
On ProvenHand
Hands listed0

Okeechobee Expansion Project is a pipeline expansion in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2019. It runs 3.4 miles of 36" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Okeechobee Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP18-531”. Federal Energy Regulatory Commission. 19 July 2018. Retrieved 3 October 2026.
  2. “Weekly Environmental Status Report No. 30 (final), Okeechobee Expansion Project (CP18-531)”. Florida Gas Transmission Company, LLC (filed with FERC). 1 October 2019. Retrieved 4 October 2026.
  3. “Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization (Docket No. CP18-531-000), Federal Register 2018-16461”. Federal Energy Regulatory Commission (published in the Federal Register). 1 August 2018. Retrieved 4 October 2026.
  4. “Weekly Environmental Status Report No. 1, Okeechobee Expansion Project (CP18-531)”. Florida Gas Transmission Company, LLC (filed with FERC). 13 March 2019. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.