Okeechobee Expansion Project
From the ProvenHand pipeline wiki
Okeechobee Expansion Project is a pipeline expansion in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2019. It runs 3.4 miles of 36" pipe.
| Okeechobee Expansion Project | |
|---|---|
| General information | |
| Project type | Expansion[1] |
| Status | In service[2] |
| Owner and operator | |
| State | Florida[3] |
| Counties | Hillsborough, Martin, Polk[3] |
| Construction started | 5 March 2019[4] |
| FERC docket | CP18-531[1] |
| Technical information | |
| Length | 3.4 mi[3] |
| Pipe size | 36"[2] |
| Capacity added | 12,000 million British thermal units per day (MMBtu/d) of available firm transportation service[3] |
| Cost | approximately $19,500,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Okeechobee Expansion Project is a pipeline expansion in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2019. It runs 3.4 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Okeechobee Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP18-531”. Federal Energy Regulatory Commission. 19 July 2018. Retrieved 3 October 2026.
- “Weekly Environmental Status Report No. 30 (final), Okeechobee Expansion Project (CP18-531)”. Florida Gas Transmission Company, LLC (filed with FERC). 1 October 2019. Retrieved 4 October 2026.
- “Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization (Docket No. CP18-531-000), Federal Register 2018-16461”. Federal Energy Regulatory Commission (published in the Federal Register). 1 August 2018. Retrieved 4 October 2026.
- “Weekly Environmental Status Report No. 1, Okeechobee Expansion Project (CP18-531)”. Florida Gas Transmission Company, LLC (filed with FERC). 13 March 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.