OPEN (Ohio Pipeline Energy Network) Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
OPEN (Ohio Pipeline Energy Network) Project is a natural gas pipeline reversal, operated by Texas Eastern Transmission, LP. Construction began in 2015.
| OPEN (Ohio Pipeline Energy Network) Project | |
|---|---|
| Also called | Ohio Pipeline Energy Network[1], Ohio Pipeline Energy Network (OPEN) Project[2] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Reversal[3] |
| Status | In service[3] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | OH[1] or AL, KY, LA, MS, OH, TN[3][sources disagree] |
| Approved | 2 December 2014[1] |
| Construction started | 2 February 2015[4] |
| In service | December 2015[3] or 20 November 2015[4][sources disagree] |
| FERC docket | CP14-68[1] |
| FERC pre-filing docket | PF13-15[1] |
| Contractors | |
| Technical information | |
| Length | 75.8 mi[1][5] or 76 mi[3][sources disagree] |
| Pipe size | 30"[3][5] |
| Capacity | 550 MMcf/d (FERC project list)[1][3] |
| Cost | $468 million (EIA estimate; no dollar year given)[3] |
| On ProvenHand | |
| Hands listed | 0 |
OPEN (Ohio Pipeline Energy Network) Project is a natural gas pipeline reversal, operated by Texas Eastern Transmission, LP. Construction began in 2015.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Dykon Blasting Corp.[6] | rock drilling and blasting | Ohio: hired by a pipeline contractor to blast on its spread of the Spectra Energy OPEN project (76 miles of new pipeline), 15,693 lineal ft of ditch and 1,083 cubic yards of right-of-way and mass rock | 1 January 2015 |
| Associated Pipe Line Contractors, Inc.[7][8] | Prime | Texas Eastern Transmission LP 30-inch work in Columbiana, Carroll and Jefferson Counties, OH: 29.5 miles (pre-jobbed as 29 miles of 30-inch at Wellsville, OH, approx. completion Aug 2015) | from 1 January 2015 |
| Sheehan[5] | Prime | Spreads 2 and 3 contractor (FERC compliance monitoring report, Feb 2015) |
Spreads
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| In service | |
| Length | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on OPEN (Ohio Pipeline Energy Network) Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP14-68”. Federal Energy Regulatory Commission. 31 January 2014. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Ohio Pipeline Energy Network Project (CP14-68)”. Texas Eastern Transmission, LP (filed with FERC). 1 December 2015. Retrieved 4 October 2026.
- “Environmental Compliance Monitoring Program weekly summary report, Ohio Pipeline Energy Network Project (CP14-68), February 1-7, 2015”. Federal Energy Regulatory Commission. 24 February 2015. Retrieved 4 October 2026.
- “Spectra Energy Ohio - Pipeline blasting (portfolio entry)”. Dykon Blasting Corp. Archived from the original on 3 September 2017. Retrieved 3 October 2026.
- “Land Division (recent projects) (Wayback capture 2020-08-11)”. Associated Pipe Line Contractors, Inc. Archived from the original on 11 August 2020. Retrieved 3 October 2026.
- “Blue Light Reports, July 2015 (pre-jobs)”. Pipeliners Local Union 798. July 2015. Retrieved 6 October 2026.