Optimumization Variations is a natural gas pipeline lateral in Louisiana and Texas, operated by Golden Pass Pipeline LLC. It entered service in 2011.
| Optimumization Variations | |
|---|---|
| Also called | Golden Pass Pipeline[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Louisiana, Texas[1][2] |
| Approved | 4 October 2006[1] or 6 July 2005[1][sources disagree] |
| In service | 10 March 2011[2] |
| FERC docket | CP04-400[1] |
| FERC pre-filing dockets | PF04-1[1], PF06-8[1] |
| Technical information | |
| Length | 113 mi[1] or 69 mi[2][sources disagree] |
| Pipe size | 42"[2] |
| Capacity | 100 MMcf/d (FERC project list)[1] or 2400 MMcf/d (FERC project list)[1] or 2500 MMcf/d additional capacity (EIA)[2][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Optimumization Variations is a natural gas pipeline lateral in Louisiana and Texas, operated by Golden Pass Pipeline LLC. It entered service in 2011.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Approved | |
| Capacity | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Optimumization Variations? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.