Otay Mesa Generating CP01-145
From the ProvenHand pipeline wiki
Otay Mesa Generating CP01-145 is a pipeline project in California, operated by Otay Mesa Generating Company, LLC. It runs 0.1 miles.
| Otay Mesa Generating CP01-145 | |
|---|---|
| General information | |
| Owner and operator | |
| State | California[1] |
| Approved | 25 July 2001[1] |
| FERC docket | CP01-145[1] |
| Technical information | |
| Length | 0.1 mi[1] |
| Capacity | 110 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Otay Mesa Generating CP01-145 is a pipeline project in California, operated by Otay Mesa Generating Company, LLC. It runs 0.1 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Otay Mesa Generating CP01-145? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.