Ozark Standing Rock Compressor

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Ozark Standing Rock Compressor is a natural gas pipeline expansion in Arkansas, operated by Ozark Gas Transmission Co. It entered service in 2008.

Ozark Standing Rock Compressor
Also calledStanding Rock Compressor Station Project[1]
General information
KindPipeline project[2] or Facility project[3][sources disagree]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2][3]
Operator
Owner and operator
StateArkansas[2][3]
CountiesIzard[3][4]
In service15 November 2008[2]
FERC docketCP08-20[2]
Technical information
Capacity100 MMcf/d additional capacity (EIA)[2]
Capacity addedfrom 400,000 Mcf/d to 500,000 Mcf/d[3]
Units added2 × Aerial JGD-4 (electric drive, 3,250 hp each)[3] or 2 × JGD-4 (electric drive compressor, 3,250 hp each)[4][sources disagree]
Horsepower added6,500 hp[3][4]
Cost$18.8 million (EIA estimate; no dollar year given)[2] or $18,848,718[3][4][sources disagree]
On ProvenHand
Hands listed0

Ozark Standing Rock Compressor is a natural gas pipeline expansion in Arkansas, operated by Ozark Gas Transmission Co. It entered service in 2008.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $18.8 million (EIA estimate; no dollar year given)[2]
  • $18,848,718[3][4]
Kind
  • Pipeline project[2]
  • Facility project[3]
Units added
  • 2 × Aerial JGD-4 (electric drive, 3,250 hp each)[3]
  • 2 × JGD-4 (electric drive compressor, 3,250 hp each)[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Ozark Standing Rock Compressor? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP08-20”. Federal Energy Regulatory Commission. 9 November 2007. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of request under blanket authorization, Ozark Gas Transmission, LLC (CP08-20)”. FERC. 20 November 2007. Retrieved 4 October 2026.
  4. “Ozark Gas Transmission, LLC; Notice of Request Under Blanket Authorization (Docket No. CP08-20-000), Federal Register E7-23072”. Federal Energy Regulatory Commission (published in the Federal Register). 28 November 2007. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.