Ozark Supply Access Project is a natural gas pipeline loop in Arkansas, operated by Ozark Gas Transmission Co. Construction began in 2023 and the line entered service in 2024. It runs 2 miles of 16" pipe.
| Ozark Supply Access Project | |
|---|---|
| General information | |
| Project type | Loop[1] |
| Status | In service[2][3] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| Facility project | |
| State | Arkansas[1] |
| Counties | Izard, Lawrence[1] |
| Construction started | 4 January 2023[6] |
| In service | 8 April 2024[2][3] |
| FERC docket | CP22-511[4] |
| Technical information | |
| Length | 2 mi[1] |
| Pipe size | 16"[1] |
| Cost | $36,500,000[5] |
| On ProvenHand | |
| Hands listed | 0 |
Ozark Supply Access Project is a natural gas pipeline loop in Arkansas, operated by Ozark Gas Transmission Co. Construction began in 2023 and the line entered service in 2024. It runs 2 miles of 16" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Ozark Supply Access Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Notice of Request Under Blanket Authorization, Ozark Gas Transmission, L.L.C. (CP22-511)”. Federal Energy Regulatory Commission. 28 September 2022. Retrieved 4 October 2026.
- “Environmental Inspector's Weekly Status Report No. 66, Ozark Supply Access Project (CP22-511)”. Ozark Gas Transmission, L.L.C. (filed with FERC). 10 April 2024. Retrieved 4 October 2026.
- “Black Bear Transmission Places Ozark Supply Access Project In-Service”. Black Bear Transmission LLC (news release, Wayback capture 2024-05-23). Archived from the original on 23 May 2024. Retrieved 4 October 2026.
- “FERC eLibrary docket CP22-511”. Federal Energy Regulatory Commission. 19 September 2022. Retrieved 3 October 2026.
- “Environmental Assessment Report, Ozark Sections 157.205, 157.208 and 157.210 (CP22-511)”. Federal Energy Regulatory Commission (staff report). 28 November 2022. Retrieved 4 October 2026.
- “Weekly Status Report No. 1, Ozark Supply Access Project (CP22-511)”. Ozark Gas Transmission, L.L.C. (filed with FERC). 11 January 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.