Palmyra to South Sioux City A-line Abandonment Project

From the ProvenHand pipeline wiki

Palmyra to South Sioux City A-line Abandonment Project is a natural gas pipeline in Nebraska, operated by Northern Natural Gas Company. It entered service in 2020. It runs 4.2 miles of 24" pipe.

Palmyra to South Sioux City A-line Abandonment Project
General information
KindPipeline project[1]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StateNebraska[3]
CountiesDodge, Otoe[3]
Approved4 March 2020[3]
In service20 October 2020[2]
FERC docketCP19-500[1]
Technical information
Length4.2 mi[3]
Pipe size24"[3]
Cost$19,468,116 estimated cost to construct the pipeline loops[3]
On ProvenHand
Hands listed0

Palmyra to South Sioux City A-line Abandonment Project is a natural gas pipeline in Nebraska, operated by Northern Natural Gas Company. It entered service in 2020. It runs 4.2 miles of 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Palmyra to South Sioux City A-line Abandonment Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP19-500”. Federal Energy Regulatory Commission. 15 August 2019. Retrieved 3 October 2026.
  2. “Notice of In-service, Palmyra and Fremont Pipeline Loops, Palmyra to South Sioux City A-line (CP19-500)”. Northern Natural Gas Company (filed with FERC). 21 October 2020. Retrieved 4 October 2026.
  3. “Order Issuing Certificate and Approving Abandonment, Northern Natural Gas Company, Palmyra to South Sioux City A-line (CP19-500)”. FERC. 4 March 2020. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.