Panda Power Lateral Project

From the ProvenHand pipeline wiki

Panda Power Lateral Project is a natural gas pipeline lateral in Texas, operated by Gulf Crossing Pipeline Company, LLC. It entered service in 2014. It runs 16.5 miles of 16" pipe.

Panda Power Lateral Project
General information
KindPipeline project[1]
Project typeLateral[2][3]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateTexas[1][2]
CountiesGrayson[4]
Approved12 September 2013[1][5]
In service30 May 2014[2]
FERC docketCP13-64[1]
Technical information
Length16.5 mi[1][2][5]
Pipe size16"[2][5]
Capacity125 MMcf/d (FERC project list)[1][2]
Cost$26.3 million (EIA estimate; no dollar year given)[2][5]
On ProvenHand
Hands listed0

Panda Power Lateral Project is a natural gas pipeline lateral in Texas, operated by Gulf Crossing Pipeline Company, LLC. It entered service in 2014. It runs 16.5 miles of 16" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Panda Power Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP13-64”. Federal Energy Regulatory Commission. 1 February 2013. Retrieved 3 October 2026.
  4. “Environmental Assessment, Panda Power Lateral Project (CP13-64)”. Federal Energy Regulatory Commission. 19 June 2013. Retrieved 4 October 2026.
  5. “Order Issuing Certificate, Gulf Crossing Pipeline Company LLC, Panda Power Lateral Project (CP13-64)”. Federal Energy Regulatory Commission. 12 September 2013. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.