Parks Line Upgrade and Sorrento Station Project (PLUSS Project)

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Parks Line Upgrade and Sorrento Station Project (PLUSS Project) is a natural gas pipeline expansion in Louisiana, operated by Gulf South Pipeline Company, LLC.

Parks Line Upgrade and Sorrento Station Project (PLUSS Project)
Also calledParks Line Upgrade and Sorrento Station Project[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusApproved[2][3]
CommodityNatural gas[2]
Owner and operator
StateLouisiana[2][4][5]
CountiesAscension, St. Martin[3]
Approved2 December 2025[3][4]
FERC docketCP25-54[1]
Technical information
Length1.6 mi[2][4][5] or 4.5 mi[6][sources disagree]
Pipe size20", 30"[2]
Capacity236 MMcf/d (FERC project list)[2][4][5] or up to an additional 236,000 Dth/d of firm transportation service[3][sources disagree]
Horsepower added12,510 hp[3]
Cost$116.9 million (EIA estimate; no dollar year given)[2][3]
On ProvenHand
Hands listed0

Parks Line Upgrade and Sorrento Station Project (PLUSS Project) is a natural gas pipeline expansion in Louisiana, operated by Gulf South Pipeline Company, LLC.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 236 MMcf/d (FERC project list)[2][4][5]
  • up to an additional 236,000 Dth/d of firm transportation service[3]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Parks Line Upgrade and Sorrento Station Project (PLUSS Project)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-54”. Federal Energy Regulatory Commission. 28 January 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate and Approving Abandonment, Parks Line Upgrade and Sorrento Station Project (CP25-54)”. Federal Energy Regulatory Commission. 2 December 2025. Retrieved 4 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
  6. “Environmental Assessment, Parks Line Upgrade and Sorrento Station Project (CP25-54)”. Federal Energy Regulatory Commission. 5 September 2025. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.