Pelican Pipeline
From the ProvenHand pipeline wiki
Pelican Pipeline is a natural gas pipeline in Louisiana, operated by WhiteWater Midstream. It runs 170 miles of 42" pipe.
| Pelican Pipeline | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | Under construction[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Louisiana[1] |
| Contractors | |
| Technical information | |
| Length | 170 mi[1][2] |
| Pipe size | 42"[1][3] |
| Capacity | 2500 MMcf/d additional capacity (EIA)[1][3] |
| On ProvenHand | |
| Hands listed | 0 |
Pelican Pipeline is a natural gas pipeline in Louisiana, operated by WhiteWater Midstream. It runs 170 miles of 42" pipe.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Dun Transportation & Stringing, Inc.[4] | Pipe hauling | Hauling, loading and racking 170 miles of pipe (various sizes) in Natchitoches and Beauregard Parishes | from 19 January 2026 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Pelican Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Pelican Pipeline Reaches Final Investment Decision”. WhiteWater (PR Newswire release). 31 October 2024. Retrieved 3 October 2026.
- “Pelican Pipeline Announces Capacity Expansion”. WhiteWater (PR Newswire release). 30 July 2025. Retrieved 3 October 2026.
- “Job posting: Dun Transportation and Stringing for Whitewater (notified 2026-01-15)”. Teamsters National Pipeline. 15 January 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.