Permian Highway Pipeline Expansion

From the ProvenHand pipeline wiki

Permian Highway Pipeline Expansion is a natural gas pipeline expansion in Texas, operated by Kinder Morgan Energy Partners. It entered service in 2023. It runs 15 miles.

Permian Highway Pipeline Expansion
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateTexas[1]
Announced29 June 2022[2]
In serviceDecember 2023[1][3]
Contractors
Technical information
Length15 mi[1]
Capacity550 MMcf/d additional capacity (EIA)[1]
Capacity addedexpanded PHP capacity by approximately 550,000 Dth/d[3]
On ProvenHand
Hands listed0

Permian Highway Pipeline Expansion is a natural gas pipeline expansion in Texas, operated by Kinder Morgan Energy Partners. It entered service in 2023. It runs 15 miles.

Contractorsedit

ContractorWorkScopeYears
Pumpco, Inc.[4]PrimeIIR listing: Permian Highway Pipeline LLC awards Pumpco (G/C) on the PHP Expansion loops (Coyanosa and Moulton entries, each 5 miles of 36-inch, Reeves to Pecos County, TX); construction commenced Dec 2022, scheduled completion Dec 2023from 1 December 2022

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Permian Highway Pipeline Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Kinder Morgan second-quarter 2022 results release (8-K exhibit 99.1)”. Kinder Morgan, Inc. (SEC filing). 20 July 2022. Retrieved 4 October 2026.
  3. “Kinder Morgan, Inc. annual report on Form 10-K for the year ended December 31, 2023”. Kinder Morgan, Inc. (filed with the SEC). 20 February 2024. Retrieved 4 October 2026.
  4. “Industrial Info Resources project report on the Whistler grassroot natural gas pipeline (Exhibit GPLDC-1b, South Dakota PUC docket HP22-001)”. Industrial Info Resources (as filed with the South Dakota Public Utilities Commission). 2023. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.