Petal Cavern Expansion Project
From the ProvenHand pipeline wiki
Petal Cavern Expansion Project is a natural gas facility project in Mississippi, operated by Gulf South Pipeline Company, LLC.
| Petal Cavern Expansion Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Expansion[2] |
| Status | Proposed[3] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Mississippi[3] |
| Counties | Forrest[3] |
| FERC docket | CP26-127[2] |
| Contractors | |
| Technical information | |
| Capacity added | new salt dome cavern: 10.0 Bcf working gas plus 6.0 Bcf cushion gas (16 Bcf total)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Petal Cavern Expansion Project is a natural gas facility project in Mississippi, operated by Gulf South Pipeline Company, LLC.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| TRC Environmental Corporation[4] | Cultural resources consultant (Phase I survey) | Phase I cultural resources survey (January 2026) submitted to the Mississippi SHPO, which concurred in March 2026 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Petal Cavern Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Abbreviated Application for a Certificate of Public Convenience and Necessity, Petal Cavern Expansion Project (CP26-127)”. Gulf South Pipeline Company, LLC (filed with FERC). 27 February 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket CP26-127”. Federal Energy Regulatory Commission. 27 February 2026. Retrieved 3 October 2026.
- “Notice of Schedule for the Preparation of an Environmental Assessment for the Petal Cavern Expansion Project (CP26-127)”. Federal Energy Regulatory Commission. 12 June 2026. Retrieved 3 October 2026.
- “Agency correspondence (Mississippi SHPO concurrence on the Phase I cultural resources survey), Petal Cavern Expansion Project (CP26-127)”. Gulf South Pipeline Company, LLC (filed with FERC). 19 March 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.