Petal Gas Capacity Increase

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Petal Gas Capacity Increase is a natural gas pipeline lateral in Mississippi, operated by Petal Gas Storage, L.L.C. It entered service in 2005.

Petal Gas Capacity Increase
General information
KindPipeline project[1]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateMississippi[1][2]
Approved7 March 2005[1]
In serviceMay 2005[2]
FERC docketCP04-424[1]
Technical information
Pipe size36"[2]
Capacity600 MMcf/d (FERC project list)[1] or 620 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$0.97 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Petal Gas Capacity Increase is a natural gas pipeline lateral in Mississippi, operated by Petal Gas Storage, L.L.C. It entered service in 2005.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 600 MMcf/d (FERC project list)[1]
  • 620 MMcf/d additional capacity (EIA)[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Petal Gas Capacity Increase? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.