Petal Gas Capacity Increase
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Petal Gas Capacity Increase is a natural gas pipeline lateral in Mississippi, operated by Petal Gas Storage, L.L.C. It entered service in 2005.
| Petal Gas Capacity Increase | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Mississippi[1][2] |
| Approved | 7 March 2005[1] |
| In service | May 2005[2] |
| FERC docket | CP04-424[1] |
| Technical information | |
| Pipe size | 36"[2] |
| Capacity | 600 MMcf/d (FERC project list)[1] or 620 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Cost | $0.97 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Petal Gas Capacity Increase is a natural gas pipeline lateral in Mississippi, operated by Petal Gas Storage, L.L.C. It entered service in 2005.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Petal Gas Capacity Increase? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.