Phase IV Expansion
From the ProvenHand pipeline wiki
Phase IV Expansion is a natural gas pipeline in Arkansas and Louisiana, operated by Florida Gas Transmission Company, LLC. It entered service in 2001. It runs 41.7 miles of 30" pipe.
| Phase IV Expansion | |
|---|---|
| Also called | Trans-Union Interstate Pipeline Proj[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator |
|
| States | Arkansas, Louisiana[1][2] |
| Approved | 1 August 2000[1] |
| In service | 30 October 2001[2] |
| FERC docket | CP00-47[1] |
| Technical information | |
| Length | 41.7 mi[1][2] |
| Pipe size | 30"[2] |
| Capacity | 430 MMcf/d (FERC project list)[1] or 427 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Cost | $45 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Phase IV Expansion is a natural gas pipeline in Arkansas and Louisiana, operated by Florida Gas Transmission Company, LLC. It entered service in 2001. It runs 41.7 miles of 30" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Phase IV Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.