Phase IV Expansion (II is a natural gas pipeline expansion in Massachusetts and Maine, operated by Maritimes & Northeast Pipeline. It runs 1.7 miles of 30" pipe.

Phase IV Expansion (II
Also calledMaritimes & Northeast Phase IV LNG Expansion[1], Phase IV Project[2]
General information
KindPipeline project[1]
Project typeExpansion[3]
StatusIn service[3]
CommodityNatural gas[3][4]
Owner and operator
StatesMassachusetts, Maine[1][3]
Approved21 February 2007[1][4]
In service15 December 2008[3] or 15 January 2009[5][sources disagree]
FERC docketCP06-335[1]
FERC pre-filing docketPF05-17[1]
Technical information
Length1.7 mi[1][3]
Pipe size30"[3]
Capacity418 MMcf/d (FERC project list)[1] or 420 MMcf/d additional capacity (EIA)[3][sources disagree]
Capacity addedapproximately 418,000 Dth/d (mainline capacity from 415,480 to 833,317 Dth/d)[4]
Horsepower added89,900 hp[4]
Cost$321.3 million (EIA estimate; no dollar year given)[3][4]
On ProvenHand
Hands listed0

Phase IV Expansion (II is a natural gas pipeline expansion in Massachusetts and Maine, operated by Maritimes & Northeast Pipeline. It runs 1.7 miles of 30" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 418 MMcf/d (FERC project list)[1]
  • 420 MMcf/d additional capacity (EIA)[3]
In service
  • 15 December 2008[3]
  • 15 January 2009[5]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Phase IV Expansion (II? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP06-335”. Federal Energy Regulatory Commission. 16 May 2006. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “Order Issuing Certificate and Amending Presidential Permit, Maritimes & Northeast Pipeline, L.L.C. (CP06-335, Phase IV Project)”. FERC (order). 21 February 2007. Retrieved 4 October 2026.
  5. “Phase IV Project - Notice of Project In-Service (CP06-335)”. Maritimes & Northeast Pipeline, L.L.C. (filed with FERC). 23 January 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.