Phase VIII Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Phase VIII Expansion Project is a natural gas pipeline expansion in Alabama and Florida, operated by Florida Gas Transmission Company, LLC.

Phase VIII Expansion Project
Also calledFGT Phase VIII Expansion[1], Natural Gas Act re Phase VIII Expansion Project[2]
General information
KindPipeline project[1]
Project typeExpansion[2][3]
StatusIn service[3]
CommodityNatural gas[3]
Owner and operator
Operator
StatesAlabama, Florida[1][3]
Approved19 November 2009[1][4]
In service14 February 2011[3] or 1 April 2011[5][sources disagree]
FERC docketCP09-17[1]
FERC pre-filing docketPF08-14[2]
Technical information
Length483.2 mi[1] or 483 mi[3][sources disagree]
Pipe size24", 30", 36", 42"[3]
Capacity820 MMcf/d (FERC project list)[1][3]
Capacity added820,000 MMBtu per day of added firm transportation capacity (certificate order)[4]
Horsepower added213,600 hp[4]
Cost$2455 million (EIA estimate; no dollar year given)[3] or almost $2.5 billion estimated cost (certificate order)[4][sources disagree]
On ProvenHand
Hands listed0

Phase VIII Expansion Project is a natural gas pipeline expansion in Alabama and Florida, operated by Florida Gas Transmission Company, LLC.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $2455 million (EIA estimate; no dollar year given)[3]
  • almost $2.5 billion estimated cost (certificate order)[4]
In service
  • 14 February 2011[3]
  • 1 April 2011[5]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Phase VIII Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP09-17”. Federal Energy Regulatory Commission. 31 October 2008. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “Order Issuing Certificate and Denying Request for Approval of Proposed AFUDC Accounting, Florida Gas Transmission Company, LLC, Phase VIII Expansion Project (CP09-17)”. FERC (order). 19 November 2009. Retrieved 4 October 2026.
  5. “Notification of Commencement of Service, Florida Gas Transmission Company, LLC, Phase VIII Expansion Project (CP09-17)”. Florida Gas Transmission Company, LLC (filed with FERC). 1 April 2011. Retrieved 4 October 2026.