Philadelphia Lateral Expansion Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Philadelphia Lateral Expansion Project is a natural gas pipeline in Pennsylvania, operated by Texas Eastern Transmission, LP. It runs 0.4 miles of 30" pipe.
| Philadelphia Lateral Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] or Replacement[2][sources disagree] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Pennsylvania[1] |
| Counties | Delaware[2] |
| Approved | 16 February 2012[2] |
| In service | 18 October 2012[1] or 1 November 2012[4][sources disagree] |
| FERC docket | CP11-508[1] |
| Technical information | |
| Length | 0.4 mi[2] |
| Pipe size | 30"[1][2] |
| Capacity | 27 MMcf/d additional capacity (EIA)[1] |
| Cost | $14,794,000 (estimated)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Philadelphia Lateral Expansion Project is a natural gas pipeline in Pennsylvania, operated by Texas Eastern Transmission, LP. It runs 0.4 miles of 30" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Project type | |
| In service |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Philadelphia Lateral Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate and Granting Abandonment, Philadelphia Lateral Expansion Project (CP11-508)”. Federal Energy Regulatory Commission. 16 February 2012. Retrieved 4 October 2026.
- “FERC eLibrary docket CP11-508”. Federal Energy Regulatory Commission. 1 July 2011. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Philadelphia Lateral Expansion Project (CP11-508)”. Texas Eastern Transmission, LP (filed with FERC). 7 November 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.