Piecance Basin Expansion Project is a natural gas pipeline expansion in Colorado and Wyoming, operated by Wyoming Interstate Company, L.L.C.. It entered service in 2006.

Piecance Basin Expansion Project
Also calledWIG Piceance Line[1], Piceance Basin Expansion Project[2]
General information
KindPipeline project[1]
Project typeExpansion[3]
StatusIn service[3][4]
CommodityNatural gas[3]
Owner and operator
StatesColorado, Wyoming[1][3]
Approved22 September 2005[1][5]
In service28 April 2006[3]
FERC docketCP05-54[1]
FERC pre-filing docketPF04-13[1]
Technical information
Length141.7 mi[1] or 142 mi[3][sources disagree]
Pipe size24"[3]
Capacity350 MMcf/d (FERC project list)[1][3]
Cost$136.42 million (EIA estimate; no dollar year given)[3]
On ProvenHand
Hands listed0

Piecance Basin Expansion Project is a natural gas pipeline expansion in Colorado and Wyoming, operated by Wyoming Interstate Company, L.L.C.. It entered service in 2006.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Piecance Basin Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP05-54”. Federal Energy Regulatory Commission. 24 January 2005. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “Letter order authorizing commencement of service on the pipeline component, Piceance Basin Expansion Project (CP05-54)”. FERC (Office of Energy Projects). 16 March 2006. Retrieved 4 October 2026.
  5. “Order Issuing Certificate, Wyoming Interstate Company, Ltd, Piceance Basin Expansion Project (CP05-54)”. FERC. 22 September 2005. Retrieved 4 October 2026.