Driver Residue Pipeline Project
From the ProvenHand pipeline wiki
Driver Residue Pipeline Project is a natural gas pipeline lateral in Texas, operated by Atlas Pipeline Mid-Continent WestTex, LLC. It entered service in 2013. It runs 10.2 miles.
| Driver Residue Pipeline Project | |
|---|---|
| Also called | Driver Residue Pipeline[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Texas[1][2] |
| Approved | 28 September 2012[1] |
| In service | 14 February 2013[2] |
| FERC docket | CP12-468[1] |
| Technical information | |
| Length | 10.2 mi[1][2] |
| Capacity | 150 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Driver Residue Pipeline Project is a natural gas pipeline lateral in Texas, operated by Atlas Pipeline Mid-Continent WestTex, LLC. It entered service in 2013. It runs 10.2 miles.
Inspection
| Firm | Scope |
|---|---|
| Groundwater Associates LLC[3] | Environmental inspector's firm named in the project's bi-weekly construction status report (Dec 2012 - Jan 2013) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Driver Residue Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Bi-weekly status report, Dec 26, 2012 - Jan 8, 2013, Driver Residue Pipeline Project (CP12-468)”. Atlas Pipeline Mid-Continent WestTex, LLC and Pioneer Natural Resources USA, Inc. (filed with FERC). 11 January 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.