PIR-256 Raccoon Road Phase 3 Pipeline Replacement

From the ProvenHand pipeline wiki

PIR-256 Raccoon Road Phase 3 Pipeline Replacement is a pipeline replacement in Ohio, operated by Dominion East Ohio Gas Company.

PIR-256 Raccoon Road Phase 3 Pipeline Replacement
Also calledPIR-256 Raccoon Road Phase 3 High Pressure Distribution Pipeline Replacement (L#4999)[1]
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusIn service[2]
Owner and operator
StateOhio[3]
Ohio Power Siting Board case13-1273-GA-BLN[3]
On ProvenHand
Hands listed0

PIR-256 Raccoon Road Phase 3 Pipeline Replacement is a pipeline replacement in Ohio, operated by Dominion East Ohio Gas Company.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on PIR-256 Raccoon Road Phase 3 Pipeline Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Ohio Power Siting Board Filings (Dominion East Ohio web page, Wayback capture of 2015-06-26)”. Dominion East Ohio. 26 June 2015. Archived from the original on 26 June 2015. Retrieved 3 October 2026.
  2. “PUCO Docketing Information System, case record and docket list for OPSB case 13-1273”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
  3. “PUCO Docketing Information System: gas cases, purpose BLN”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.