PIR-256 Raccoon Road Phase 3 Pipeline Replacement
From the ProvenHand pipeline wiki
PIR-256 Raccoon Road Phase 3 Pipeline Replacement is a pipeline replacement in Ohio, operated by Dominion East Ohio Gas Company.
| PIR-256 Raccoon Road Phase 3 Pipeline Replacement | |
|---|---|
| Also called | PIR-256 Raccoon Road Phase 3 High Pressure Distribution Pipeline Replacement (L#4999)[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | In service[2] |
| Owner and operator | |
| State | Ohio[3] |
| Ohio Power Siting Board case | 13-1273-GA-BLN[3] |
| On ProvenHand | |
| Hands listed | 0 |
PIR-256 Raccoon Road Phase 3 Pipeline Replacement is a pipeline replacement in Ohio, operated by Dominion East Ohio Gas Company.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on PIR-256 Raccoon Road Phase 3 Pipeline Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Ohio Power Siting Board Filings (Dominion East Ohio web page, Wayback capture of 2015-06-26)”. Dominion East Ohio. 26 June 2015. Archived from the original on 26 June 2015. Retrieved 3 October 2026.
- “PUCO Docketing Information System, case record and docket list for OPSB case 13-1273”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
- “PUCO Docketing Information System: gas cases, purpose BLN”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.