Plymouth Compressor Station Looping Project
From the ProvenHand pipeline wiki
Plymouth Compressor Station Looping Project is a natural gas pipeline loop in Washington, operated by Northwest Pipeline LLC. It entered service in 2009.
| Plymouth Compressor Station Looping Project | |
|---|---|
| General information | |
| Project type | Loop[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator |
|
| State | Washington[3] |
| Counties | Benton[3] |
| In service | 16 October 2009[2] |
| FERC docket | CP09-426[1] |
| Technical information | |
| Pipe size | 24"[3] |
| Capacity added | additional 10,000 Dth/d of firm transportation capacity[3] |
| Cost | $1,634,662[3] |
| On ProvenHand | |
| Hands listed | 0 |
Plymouth Compressor Station Looping Project is a natural gas pipeline loop in Washington, operated by Northwest Pipeline LLC. It entered service in 2009.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Plymouth Compressor Station Looping Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP09-426”. Federal Energy Regulatory Commission. 2 June 2009. Retrieved 3 October 2026.
- “Weekly Status Report No. 8, Plymouth Compressor Station Looping Project, Northwest Pipeline GP (CP09-426)”. Northwest Pipeline GP (filed with FERC). 21 October 2009. Retrieved 4 October 2026.
- “Notice of request under blanket authorization, Northwest Pipeline GP (CP09-426)”. FERC. 5 June 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.