Plymouth LNG Plant Vaporizers Replacement Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Plymouth LNG Plant Vaporizers Replacement Project is a pipeline project, operated by Northwest Pipeline LLC.
| Plymouth LNG Plant Vaporizers Replacement Project | |
|---|---|
| General information | |
| Project type | Replacement[1] or Rebuild[2][sources disagree] |
| Status | Approved[2] |
| Owner and operator | |
| Counties | Benton[2] |
| FERC docket | CP26-439[1] |
| Technical information | |
| Cost | $54.6 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Plymouth LNG Plant Vaporizers Replacement Project is a pipeline project, operated by Northwest Pipeline LLC.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Plymouth LNG Plant Vaporizers Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-439”. Federal Energy Regulatory Commission. 30 April 2026. Retrieved 3 October 2026.
- “Environmental Assessment Report for Northwest Pipeline LLC's Section 2.55(b)(3) Advance Notification of Replacement of Facilities under CP26-439.”. Federal Energy Regulatory Commission (staff document). 20 May 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.