Pompano Compressor Station 21.5 Project is a pipeline project in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2014. It runs 1.2 miles.
| Pompano Compressor Station 21.5 Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owner and operator | |
| State | Florida[1] |
| Counties | Broward[2] |
| Approved | 30 October 2014[1] |
| Construction started | November 2014[3] |
| FERC docket | CP14-21[1] |
| Technical information | |
| Length | 1.2 mi[1] |
| Capacity | 25 MMcf/d (FERC project list)[1] |
| Horsepower added | 22,000 hp[2] |
| On ProvenHand | |
| Hands listed | 0 |
Pompano Compressor Station 21.5 Project is a pipeline project in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2014. It runs 1.2 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Pompano Compressor Station 21.5 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Notice of Intent To Prepare an Environmental Assessment for the Proposed Pompano Compressor Station 21.5 Project (CP14-21), Federal Register 79(12)”. Federal Energy Regulatory Commission (Federal Register). 17 January 2014. Retrieved 3 October 2026.
- “Notice of Commencement of Construction, Florida Gas Transmission Pompano Compressor Station 21.5 Project (CP14-21)”. Federal Energy Regulatory Commission. 17 November 2014. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.