Port Dolphin Project
From the ProvenHand pipeline wiki
Port Dolphin Project is a pipeline project in Florida, operated by Port Dolphin Energy LLC/Port Dolphin Project. It runs 3.9 miles.
| Port Dolphin Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Operator | Port Dolphin Energy LLC/Port Dolphin Project[1] |
| Owner and operator | |
| State | Florida[1][2] |
| Counties | Manatee[2] |
| Approved | 3 December 2009[1][3] |
| FERC docket | CP07-191[1] |
| Technical information | |
| Length | 3.9 mi[1] |
| Capacity | 1200 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Port Dolphin Project is a pipeline project in Florida, operated by Port Dolphin Energy LLC/Port Dolphin Project. It runs 3.9 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Port Dolphin Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “US Department of the Interior scoping comments on Port Dolphin Energy's amended application for a proposed 3.93-mile onshore pipeline in Manatee County, Florida (CP07-191), eLibrary filing description”. US Department of the Interior (filed with FERC). 12 March 2008. Retrieved 4 October 2026.
- “Request for an extension of time to construct the facilities authorized by the 12/3/09 Order Issuing Certificates (CP07-191), eLibrary filing description”. Port Dolphin Energy LLC (filed with FERC). 20 October 2014. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.