Portland XPress Project Phase III
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Portland XPress Project Phase III is a natural gas pipeline expansion, operated by Portland Natural Gas Transmission System. It entered service in 2020.
| Portland XPress Project Phase III | |
|---|---|
| Also called | Portland Xpress Project Phase 3[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | MA, ME[1][3] or ME, NH[2][sources disagree] |
| Counties | Massachusetts: Middlesex Maine: Cumberland, York[3] |
| Approved | 21 February 2019[1][4] |
| In service | 28 October 2020[2] |
| FERC docket | CP18-506[1] |
| Technical information | |
| Capacity | 46.71 MMcf/d (FERC project list)[1] or 24.375 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Units added | 1 (6,300 hp each)[3] |
| Horsepower added | 6,300 hp[3] |
| On ProvenHand | |
| Hands listed | 0 |
Portland XPress Project Phase III is a natural gas pipeline expansion, operated by Portland Natural Gas Transmission System. It entered service in 2020.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Portland XPress Project Phase III? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Applications, Portland Natural Gas Transmission System, Portland XPress Project Phase III (CP18-506)”. FERC (public notice, eLibrary). 28 June 2018. Retrieved 4 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Portland Natural Gas Transmission System et al. (CP18-506 et al.)”. FERC (eLibrary filing description). 21 February 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.