Putnam Expansion Project

From the ProvenHand pipeline wiki

Putnam Expansion Project is a natural gas pipeline expansion in Florida, operated by Florida Gas Trans Co. It entered service in 2022. It runs 20.7 miles of 30" pipe.

Putnam Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusIn service[1][3]
CommodityNatural gas[1]
OperatorFlorida Gas Trans Co[1]
Operator
Owner and operator
StateFlorida[1]
CountiesClay, Columbia, Orange, Putnam, Union[4]
Approved19 March 2020[4]
In service25 February 2022[1][3]
FERC docketCP19-474[1]
Technical information
Length20.7 mi[1]
Pipe size30"[1][4]
Capacity169 MMcf/d additional capacity (EIA)[1]
Cost$102.6 million (EIA estimate; no dollar year given)[1][4]
On ProvenHand
Hands listed0

Putnam Expansion Project is a natural gas pipeline expansion in Florida, operated by Florida Gas Trans Co. It entered service in 2022. It runs 20.7 miles of 30" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Putnam Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP19-474”. Federal Energy Regulatory Commission. 31 May 2019. Retrieved 3 October 2026.
  3. “Notice of Commencement of Service, Putnam Expansion Project Phase II (CP19-474)”. Florida Gas Transmission Company, LLC (filed with FERC). 28 February 2022. Retrieved 4 October 2026.
  4. “Order Issuing Certificate, Florida Gas Transmission Company, LLC (CP19-474)”. Federal Energy Regulatory Commission. 19 March 2020. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.