Questar Pipeline Mainline 104 Project
From the ProvenHand pipeline wiki
Questar Pipeline Mainline 104 Project is a natural gas pipeline expansion in Utah, operated by Questar Pipeline. It entered service in 2001. It runs 75.6 miles of 24" pipe.
| Questar Pipeline Mainline 104 Project | |
|---|---|
| Also called | Questar MainLine 104 Expansion[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Utah[1][2] |
| Approved | 14 June 2001[2] |
| In service | 30 November 2001[1] |
| FERC docket | CP00-68[2] |
| Technical information | |
| Length | 75.6 mi[1][2] |
| Pipe size | 24"[1] |
| Capacity | 272 MMcf/d (FERC project list)[2] or 265 MMcf/d additional capacity (EIA)[1][sources disagree] |
| Cost | $80.85 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Questar Pipeline Mainline 104 Project is a natural gas pipeline expansion in Utah, operated by Questar Pipeline. It entered service in 2001. It runs 75.6 miles of 24" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Questar Pipeline Mainline 104 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.