Questar Pipeline Southern System Expansion Project II
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Questar Pipeline Southern System Expansion Project II is a natural gas pipeline expansion in Utah, operated by Questar Pipeline Company Southern System.
| Questar Pipeline Southern System Expansion Project II | |
|---|---|
| Also called | Questar Southern System Expansion to Goshen[1], Southern System Expansion Project II[2] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1][3] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | Questar Pipeline Company Southern System[2] |
| Operator | |
| Owner and operator | |
| State | Utah[1][2] |
| Counties | Carbon, Duchesne, Uintah[4] |
| Approved | 23 April 2007[2] |
| In service | November 2007[1] or 1 November 2007[5][sources disagree] |
| FERC docket | CP07-25[2] |
| FERC pre-filing docket | PF06-18[2] |
| Technical information | |
| Length | 58.6 mi[2] or 59 mi[1][sources disagree] |
| Pipe size | 24"[1] |
| Capacity | 175 MMcf/d (FERC project list)[1][2] |
| Cost | $107.7 million (EIA estimate; no dollar year given)[1] or $106,271,671 actual cost of construction (estimate in the application: $107,693,000)[4][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Questar Pipeline Southern System Expansion Project II is a natural gas pipeline expansion in Utah, operated by Questar Pipeline Company Southern System.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Questar Pipeline Southern System Expansion Project II? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP07-25”. Federal Energy Regulatory Commission. 21 November 2006. Retrieved 3 October 2026.
- “Cost Statement, Southern System Expansion Project II (CP07-25)”. Questar Pipeline Company (filed with FERC). 25 April 2008. Retrieved 4 October 2026.
- “Questar Pipeline Company prospectus supplement (Form 424B5)”. Questar Pipeline Company (SEC filing). 10 January 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.