Questar Southern Sys 2005 Expansion
From the ProvenHand pipeline wiki
Questar Southern Sys 2005 Expansion is a natural gas pipeline expansion in Colorado and Utah, operated by Questar Pipeline Company Southern System. It entered service in 2005. It runs 18.7 miles of 24" pipe.
| Questar Southern Sys 2005 Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2][3] |
| Status | In service[2][4] |
| Commodity | Natural gas[2][5] |
| Operator | Questar Pipeline Company Southern System[1] |
| Owner and operator | |
| States | Colorado, Utah[1][2][5] |
| Counties | Colorado: Rio Blanco Utah: Carbon, Duchesne, Utah[5] |
| Approved | 21 January 2005[1][5] |
| In service | November 2005[2][4] |
| FERC docket | CP05-5[1] |
| FERC pre-filing docket | PF04-6[1] |
| Technical information | |
| Length | 18.7 mi[1][2][5] |
| Pipe size | 24"[2][5] |
| Capacity | 102 MMcf/d (FERC project list)[1][2] |
| Capacity added | additional 102,000 Dth/d[5] |
| Horsepower added | 15,600 hp[5] |
| Cost | $54.6 million (EIA estimate; no dollar year given)[2] or $54,614,336[5][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Questar Southern Sys 2005 Expansion is a natural gas pipeline expansion in Colorado and Utah, operated by Questar Pipeline Company Southern System. It entered service in 2005. It runs 18.7 miles of 24" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Questar Southern Sys 2005 Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP05-5”. Federal Energy Regulatory Commission. 12 October 2004. Retrieved 3 October 2026.
- “Second Notice of Completion of Construction and Commencement of Service, Southern System Expansion Project (CP05-5)”. Federal Energy Regulatory Commission. 7 November 2005. Retrieved 4 October 2026.
- “Order issuing certificate, Questar Pipeline Company (Southern System Expansion Project, CP05-5)”. Federal Energy Regulatory Commission. 21 January 2005. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.