Rahway River Additional Pipe Replacement Project
From the ProvenHand pipeline wiki
Rahway River Additional Pipe Replacement Project is a natural gas pipeline replacement in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2018.
| Rahway River Additional Pipe Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | New Jersey[3] |
| Approved | 27 October 2018[2] |
| Construction started | 29 October 2018[2] |
| FERC docket | CP18-541[1] |
| Technical information | |
| Pipe size | 20"[3] |
| On ProvenHand | |
| Hands listed | 0 |
Rahway River Additional Pipe Replacement Project is a natural gas pipeline replacement in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2018.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Rahway River Additional Pipe Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP18-541”. Federal Energy Regulatory Commission. 17 August 2018. Retrieved 3 October 2026.
- “Final weekly status report, Rahway River Additional Pipe Replacement Project (CP18-541)”. Texas Eastern Transmission, LP (filed with FERC). 6 December 2018. Retrieved 4 October 2026.
- “Notice of Request Under Blanket Authorization, Texas Eastern Transmission, LP (CP18-541)”. Federal Energy Regulatory Commission. 27 August 2018. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.