Rahway River Additional Pipe Replacement Project

From the ProvenHand pipeline wiki

Rahway River Additional Pipe Replacement Project is a natural gas pipeline replacement in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2018.

Rahway River Additional Pipe Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StateNew Jersey[3]
Approved27 October 2018[2]
Construction started29 October 2018[2]
FERC docketCP18-541[1]
Technical information
Pipe size20"[3]
On ProvenHand
Hands listed0

Rahway River Additional Pipe Replacement Project is a natural gas pipeline replacement in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2018.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Rahway River Additional Pipe Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP18-541”. Federal Energy Regulatory Commission. 17 August 2018. Retrieved 3 October 2026.
  2. “Final weekly status report, Rahway River Additional Pipe Replacement Project (CP18-541)”. Texas Eastern Transmission, LP (filed with FERC). 6 December 2018. Retrieved 4 October 2026.
  3. “Notice of Request Under Blanket Authorization, Texas Eastern Transmission, LP (CP18-541)”. Federal Energy Regulatory Commission. 27 August 2018. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.