Rahway River Line 2 Pipeline Replacement Project is a natural gas pipeline replacement in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2024.

Rahway River Line 2 Pipeline Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusIn service[3]
CommodityNatural gas[1]
Owner and operator
StateNew Jersey[1]
CountiesMiddlesex, Union[1]
Construction startedMay 2024[4]
FERC docketCP24-31[2]
Technical information
Pipe size20"[1]
Cost$18.7 million[1]
On ProvenHand
Hands listed0

Rahway River Line 2 Pipeline Replacement Project is a natural gas pipeline replacement in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2024.

Crossings

FeatureMethod
Rahway River[1]HDD

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Rahway River Line 2 Pipeline Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report, Rahway River Line 2 Pipeline Replacement Project (CP24-31)”. FERC. 26 February 2024. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP24-31”. Federal Energy Regulatory Commission. 18 December 2023. Retrieved 3 October 2026.
  3. “Weekly Status Report No. 46 (June 26 to July 30, 2025), Rahway River Line 2 Pipeline Replacement Project (CP24-31)”. Texas Eastern Transmission, LP (filed with FERC). 31 July 2025. Retrieved 4 October 2026.
  4. “Weekly Status Report No. 1 (May 13 to 21, 2024), Rahway River Line 2 Pipeline Replacement Project (CP24-31)”. Texas Eastern Transmission, LP (filed with FERC). 22 May 2024. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.