Rahway River Pipe Replacement Project

From the ProvenHand pipeline wiki

Rahway River Pipe Replacement Project is a pipeline replacement in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2018.

Rahway River Pipe Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1]
Owner and operator
StateNew Jersey[2]
Approved5 December 2017[3]
Construction started1 May 2018[3]
FERC docketCP17-496[1]
Technical information
Pipe size20"[2]
Costapproximately $20 million[2]
On ProvenHand
Hands listed0

Rahway River Pipe Replacement Project is a pipeline replacement in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2018.

Crossings

FeatureMethod
Rahway River[4]HDD

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Rahway River Pipe Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP17-496”. Federal Energy Regulatory Commission. 28 September 2017. Retrieved 3 October 2026.
  2. “Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization (Docket No. CP17-496-000), Federal Register 2017-21832”. Federal Energy Regulatory Commission (published in the Federal Register). 10 October 2017. Retrieved 4 October 2026.
  3. “Texas Eastern weekly report for May 1 to May 7, 2018, Rahway River Pipe Replacement Project (CP17-496)”. Texas Eastern Transmission, LP (filed with FERC). 15 May 2018. Retrieved 4 October 2026.
  4. “Prior Notice of Blanket Certificate Activity, Rahway River Pipe Replacement Project, Texas Eastern Transmission, LP (CP17-496)”. Texas Eastern Transmission, LP (filed with FERC). 28 September 2017. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.