Raton Basin 2005 Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Raton Basin 2005 Expansion Project is a natural gas pipeline expansion in Colorado, Kansas and Oklahoma, operated by Colorado Interstate Gas Company, L.L.C.. It was built and entered service in 2005. It runs 102 miles of 16", 20", 24" pipe.

Raton Basin 2005 Expansion Project
Also calledCIG Raton Basin 2005 Expansion[1], Colorado Interstate Natural Gas Co's proposed Raton Basin 2005 Expansion Project[2]
General information
KindPipeline project[1]
Project typeExpansion[2][3][4]
StatusIn service[3][5]
CommodityNatural gas[3][4]
Owner and operator
StatesColorado, Kansas, Oklahoma[1][3][4]
Approved1 June 2005[1][4]
Construction startedJune 2005[6]
In service15 December 2005[3][5]
FERC docketCP05-50[1]
FERC pre-filing docketPF05-1[1]
Technical information
Length102 mi[1][3][4]
Pipe size16", 20", 24"[3][4]
Capacity105 MMcf/d (FERC project list)[1] or 104 MMcf/d additional capacity (EIA)[3][sources disagree]
Capacity addedapproximately 105 MDth/d[4]
Units added1 (gas-driven compressor engine, 1,770 hp each)[4]
Horsepower added1,770 hp[4]
Cost$60.4 million (EIA estimate; no dollar year given)[3] or approximately $60,594,700[4] or approximately $59 million[6][sources disagree]
On ProvenHand
Hands listed0

Raton Basin 2005 Expansion Project is a natural gas pipeline expansion in Colorado, Kansas and Oklahoma, operated by Colorado Interstate Gas Company, L.L.C.. It was built and entered service in 2005. It runs 102 miles of 16", 20", 24" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 105 MMcf/d (FERC project list)[1]
  • 104 MMcf/d additional capacity (EIA)[3]
Cost
  • $60.4 million (EIA estimate; no dollar year given)[3]
  • approximately $60,594,700[4]
  • approximately $59 million[6]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Raton Basin 2005 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP05-50”. Federal Energy Regulatory Commission. 12 January 2005. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “Order issuing certificate, Colorado Interstate Gas Company (Raton Basin 2005 Expansion Project, CP05-50)”. Federal Energy Regulatory Commission. 1 June 2005. Retrieved 4 October 2026.
  5. “Notice of commencement of service for the final portion of the Raton Basin 2005 Expansion Project (CP05-50)”. Federal Energy Regulatory Commission. 19 December 2005. Retrieved 4 October 2026.
  6. “Colorado Interstate Gas Company Form 10-Q for the quarter ended September 30, 2005”. Colorado Interstate Gas Company (SEC filing). November 2005. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.