Raymond Golf Course Replacement Project

From the ProvenHand pipeline wiki

Raymond Golf Course Replacement Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas of Ohio. It runs 1 miles of 12" pipe.

Raymond Golf Course Replacement Project
Also calledRaymond Memorial Golf Course Replacement Project[1], Raymond Memorial Golf Course Project[2]
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusIn service[1]
CommodityNatural gas[2]
Owner and operator
StateOhio[3]
Ohio Power Siting Board case13-2227-GA-BLN[3]
Technical information
Length1 mi[2]
Pipe size12"[2]
On ProvenHand
Hands listed0

Raymond Golf Course Replacement Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas of Ohio. It runs 1 miles of 12" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Raymond Golf Course Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “PUCO Docketing Information System, case record and docket list for OPSB case 13-2227”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
  2. “Columbia Gas Files OPSB Applications (Columbia Gas of Ohio news release, Wayback capture of 2014-09-03)”. Columbia Gas of Ohio, Inc. 13 February 2014. Archived from the original on 3 September 2014. Retrieved 3 October 2026.
  3. “PUCO Docketing Information System: gas cases, purpose BLN”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.